Nodal Icon Nodal Engineering
BIM Specialists  ·  UAE & Egypt

Precision BIM for
Projects That Demand
Excellence

Fully coordinated models, clash-free shop drawings, and LOD 300–500 documentation — delivered on programme, every batch.

Our Services → View Projects
Scroll
500+Projects Delivered
20+Years Experience
UAE · EgyptOperating Markets
LOD 100–500Full BIM Range
What We Do
End-to-End BIM Services

From execution planning to final as-built — every stage of the BIM workflow, handled by specialists.

🏗️

BIM Coordination & Management

BIM Execution Plans, Task Information Delivery Plans, and project templates — ensuring every discipline works from a single source of truth.

BXPTIDPISO 19650Clash Detection
🧩

3D Modeling & Clash Detection

Fully coordinated architectural, structural, and MEP models in Revit. Multi-discipline clash matrices and resolution reports before site work begins.

RevitNavisworksMEPStructural
📐

Shop Drawings

Model-based shop drawings extracted directly from coordinated BIM models — accurate, construction-ready, and consultant-compliant.

Layout PlansStakingDetail Drawings
📦

Revit Family Creation

Custom parametric Revit families — annotation, GRC elements, system components, and specification-matched product families.

ParametricGRCAnnotationSystem Families
⚙️

Dynamo Scripting & Automation

Custom Dynamo scripts to automate repetitive modeling tasks, generate data schedules, and cut hours off every deliverable cycle.

DynamoAutomationData Schedules
🏁

As-Built & LOD 500 Documentation

Final as-built model updates, LOD 500 documentation, and handover packages — fully compliant with employer information requirements.

LOD 500As-BuiltEIR CompliantHandover
Selected Work
Projects We're Proud Of

Spanning residential, hospitality, mixed-use, and heritage restoration across the UAE, Egypt, and Saudi Arabia.

🏨
Hospitality
📍 Al Madinah, Saudi Arabia

Hotel Tower — Full BIM Coordination

Multi-storey hotel development. Delivered clash-free architectural, structural, and MEP models with full shop drawing and quantity survey packages.

3D ModelClash ReportsShop DrawingsQTO
🏘️
Residential
📍 New Cairo, Egypt

Premium Compound — Villa BIM Package

LOD 300 BIM models and GRC Revit family creation for multiple villa typologies. Full architectural coordination and model-based documentation.

Revit FamiliesGRC ElementsLOD 300Arch Coordination
🏋️
Sports & Leisure
📍 Cairo, Egypt

Sports Club — Shop Drawings Package

Zone-by-zone staking and layout shop drawings extracted from coordinated BIM model. Delivered directly to construction team for site use.

Staking DrawingsZone PlansBIM Coordination
🏛️
Heritage
📍 Cairo, Egypt

Historic Mosque — Documentation & Restoration

Precision BIM documentation of existing fabric to support conservation and restoration planning. As-found model and architectural survey drawings.

Existing ConditionsAs-Found ModelRestoration Drawings
🏢
Mixed-Use
📍 October City, Egypt

Mixed-Use Tower — Design & BIM

Design and build project featuring high-rise residential and commercial integration. Full BIM documentation from concept through construction-ready deliverables.

Design BIMCoordinationRendersConstruction Docs
🏠
Residential · UAE 🇦🇪
📍 Studio City, Dubai

Arisha Terraces — BIM Coordination

Active project: full BIM coordination and architectural drawing services for a 4-building residential development. 421 deliverables across 4 staged batches.

LOD 300–500Shop DrawingsClash DetectionAs-Built
How We Work
Our Delivery Process

Structured, transparent, and built around your programme.

01

BIM Execution Plan

Review EIR, agree LOD requirements, establish naming conventions, issue BXP and TIDP before a single element is created.

02

Federated Modeling

Architectural, structural, and MEP models developed in parallel using shared Revit templates. Workset discipline enforced from day one.

03

Clash Detection

Multi-discipline clash matrices run weekly. Issues logged, assigned, and resolved before submission — zero surprises for the consultant.

04

Submittal Package

Shop drawings, schedules, and model files packaged per transmittal requirements with cover sheet, revision log, and response tracking.

05

Revision Cycles

Consultant comments incorporated within agreed turnaround. Every comment tracked, every RFI closed, written confirmation provided.

06

LOD 500 Handover

Final model updated to as-built. Complete handover package: model, drawings, data-rich schedules, and FM-ready information.

About Nodal

BIM Expertise Built Over Two Decades

Nodal Engineering brings structured, ISO 19650-aligned BIM delivery to the UAE and Egyptian markets — combining senior project management credentials with deep Revit technical expertise.

Lean, specialist team. No generalists. Every person who touches your project is a BIM professional.

  • Active projects in Dubai (UAE), Egypt, and Saudi Arabia
  • Senior team: PMP®, LEED Green Associate, FIDIC CLAC certified
  • BIM technical lead: Revit, Dynamo, Navisworks, ISO 19650
  • 20+ years combined experience in architecture, construction & BIM
  • 500+ projects delivered across residential, hospitality, and heritage
Work With Us →
🏆

PMP® — Project Management Professional

PMI-certified project leadership and delivery management

🌱

LEED Green Associate

Sustainable design integration across BIM workflows

📋

FIDIC Contracts & Claims (CLAC)

Contract management and claims expertise

📐

ISO 19650 Aligned Workflows

BIM processes structured to international standards

Technology
Our Software Stack
🧱 Autodesk Revit
🔗 Navisworks
⚙️ Dynamo
📅 Primavera P6
☁️ Autodesk Construction Cloud
📊 BIM 360
📁 AutoCAD
Contact

Let's Talk About Your Project

Whether you need a BIM coordination partner for an ongoing project or a full LOD 500 delivery from the ground up — get in touch.

📧

Business Development

info@nodal-engineering.com
📱
📍

Offices

Dubai, UAE  ·  Cairo, Egypt